Next we installed the plaster board !

The fibro was relatively easy, Deborah and I carted all the heavy sheets, measured and cut- back breaking

The outside was looking OK, but the interior was bare

The verandah looked good amongst the already mature trees

fibro sheeting at the rear

Deborah and I were dreadinf putting the itching insulation on ... and then the plasterboard

Cam came over one weekend and helped put the Insulation in and plasterboard for the walls- thanks

Deborah and Cam became the insulation Gurus, cutting each section and placing it



Deborah and I put the ceiling insulation in and the ceiling plasterboard-n what a nightmare- thanks for the plasterboard lifter Mick- it was a life safer.

that big red apparatus was what we used to lift the large plasterboard sections for the ceiling. each one was glued and screwed. All the lighting  wiring is heavy gauge 240volt because i am using a 12volt system with 3watt leds

Interior walls going up

messing join of the split level

the insulation bulging out- geeze it works well though

ok , a few gaps







building the shower recess